← Back to MO YGMSB-260401 / 1 Job traveler — travels with the batch on paper (wet-ink signatures stay official)

JOB TRAVELER — YGMSB-260401 / 1

Product
[2024-04] Yes Global AlphaMax V+ / 2024-04
Planned qty
1,197 pcs
FG batch
AMX-2604-01
Expiry
2028-04-12
Customer
NatusVincere Marketing Sdn Bhd
Sales order
YGMSB-260401 line 1
Prod. deadline
2026-03-26
Location
CTSB — 11, Balakong Jaya
BMR
BMR-26-031

Weighing record

# Material Lot number(s) Required Actual weighed Weighed by Verified by
1 Taurine / Nexus Wise 202407088 1,197,000 mg
2 AlphaMax Vit-Min Premix
Sieve before mixing — 40 mesh
PMX-260322 2,394,000 mg
3 Ascorbic Acid / ITS-Luwei LW2408196 2,475 mg
4 Acesulfame Potassium (ACK) 202407123 59,850 mg
5 Apple Flavor / CK-1647
Add last — heat-sensitive
APF02140925 556,200 mg
6 Apple Juice Powder AJP03150625 + AJP04220525 3,591,000 mg
7 Affron
⚠ short 386,850 mg — see deviation
AFR230511 1,197,000 mg
8 AlphaMax V+ Paper Box pending PO-558 1,197 pcs

Operations checklist

Step Operation Resource Planned time Done by Date/Time
1 Prepare Ingredients & Mixing Ribbon Blender 300L MX-01 4h 00m

Work instruction — Charge powders into the Ribbon Blender in order of ascending bulk density — carriers and fibre first, actives next, flavour and sweetener premixes last. Dry-mix 10 minutes before adding the flavour premix, then blend a further 15 minutes at the set RPM. Scrape blender walls and paddle at the 12-minute mark to break up any caking near the taurine charge. Pull a top/middle/bottom sample for the in-process blend-uniformity check before releasing to Sachet Packing. Stop and cool the load if bowl temperature exceeds the set point.

Machine settings: Mixer RPM 120 · Temp 45°C · Mix time 25 min · Mesh 80

2 Sachet Packing Sachet Filling Line 1 FL-01 8h 00m

Work instruction — Load the roll-stock onto Sachet Line 1 and verify the film registration mark against the photocell before running. Set H-seal to 165°C and V-seal to 170°C; run a 20-sachet warm-up strip and check peel strength before committing to the batch. Verify fill weight against the 12 g target every 30 minutes on the check-weigher lane and log it on the BMR. Perform the mandatory air-bubble seal test at shift start and after every changeover. Reject and quarantine any sachet with a visible seal gap, wrinkle, or short fill — do not rework into the good-pack stream.

Machine settings: H-seal 165°C · V-seal 170°C · Line speed 45/min · Fill weight 12 g

3 Print Expiry Date on Box/Pouch/Sachet 1h 30m
4 Pack into End Product 6h 00m
5 Shrink Wrap 2h 00m
6 Cartoning Cartoning Machine PK-01 2h 30m
7 QC Check & Batch Release 1h 00m

Production notes

Customer-paid paper boxes arrive with PO-558 (~2026-05-09) — start Mixing and Sachet Packing beforehand, hold at “Pack into End Product” until the boxes clear incoming QC. Affron shortage (386,850 mg) must be resolved before batch-record sign-off.

Generated by Gaia 2026-07-07 · page 1 of 1 · execution and release are recorded on the BMR in wet ink (GMP).