Self-inspection — annual GMP audit
Scheduling — 3 of 10 areas booked| Area | Planned date | Actual date | Team members | Status | Findings | Remarks |
|---|---|---|---|---|---|---|
| 1. Raw Material Storage | 2026-11-02 | — | Farah (QA) · Lee (QC) | Scheduled | — | team confirmed |
| 2. Production Area | 2026-11-03 | — | Farah (QA) · Sarah (FM) | Scheduled | — | production paused 1 shift |
| 3. Packaging Area | 2026-11-04 | —2026-07-07 | Farah (QA) · Ahmad (Op) | ScheduledDone | — | team confirmed1 major → CAPA-26-01 |
| 4. FG Warehouse | 2026-11-09 (tentative)2026-11-09 | — | —Farah (QA) · Kevin (Store) | PlannedScheduled | — | team to assignavoid 11/12 — stocktake week |
| 5. QC Laboratory | 2026-11-10 (tentative) | — | — | Planned | — | independent auditor — not QC staff |
| 6. Documentation & Records | 2026-11-11 (tentative) | — | — | Planned | — | recheck CAPA-25-09 area |
| 7. Sanitation & Hygiene | 2026-11-12 (tentative) | — | — | Planned | — | recheck CAPA-25-07 area |
| 8. Water System | 2026-11-16 (tentative) | — | — | Planned | — | with June micro results on hand |
| 9. Pest Control | 2026-11-17 (tentative) | — | — | Planned | — | Rentokil trend reports Jan–Oct |
| 10. Calibration & Maintenance | 2026-11-18 (tentative) | — | — | Planned | — | watch item: CP-01 overdue history |
Status flow per area: Planned → Scheduled (date + team) → In progress → Done. An area is Done only when its findings are filed — even if the count is zero.
| Area | Severity | Finding | CAPA | Status |
|---|---|---|---|---|
| Sanitation & Hygiene | Minor | Drain cover corroded in Mixing Room — replaced with SS304 cover, drain fogging added to weekly program | CAPA-25-07 | Closed |
| Documentation & Records | Minor | 2 uncontrolled forms in use at Packaging — forms retired, document control register updated | CAPA-25-09 | Closed |
| Calibration & Maintenance | Major | Two balances used past calibration due date — interim verification done; recurrence 2026 (CP-01) keeps the CAPA open | CAPA-25-11 | Open |
| Production Area | Minor | Worn door seal at Filling Room 1 — replaced same day, no CAPA needed | — | Closed |
Open CAPAs from the previous cycle are the first checklist item of the next one — CAPA-25-11 must show effective closure before area 10 can pass in 2026.
Project Gaia — static mockup in Filament v3 idiom. No backend. The 10 areas mirror the GMP reference self-inspection schedule (DC4); people and findings continuous with the other screens.